top of page
highway-2211588_1920.jpg

Client

Studio Geotecnico Strutturale – SGS s.r.l.

Client

Studio Geotecnico Strutturale – SGS s.r.l.

Studio Geotecnico Strutturale – SGS s.r.l.

Client

Studio Geotecnico Strutturale – SGS s.r.l.

Sibiu Pitesti Section 3, Romania

Sector

Public

Location

Future viaducts between Cornetu and Tigveni kms 44+500 and 81+900, Romania

Year

2023

Partner

S.G.S. - STUDIO GEOTECNICO STRUTTURALE S.r.l

Client

Private

Tesseract Engineers were appointed to provide engineering services for the PAC phase (Construction Permit) of the Sibiu Pitesti Highway Section 3. Section 3 is the most complex part of the highway because it will cross the Carpathian Mountains between Cornetu and Tigveni for 37.4 kilometres, of which 12.5 kilometres will include 48 bridges and viaducts, the Poiana Tunnel, a 1.7-kilometre-long twin tunnel, two interchanges at Valeni and Cornetu, 18 kilometres of consolidation works, the construction of a maintenance and control centre, and work to preserve the environment. In particular Tesseract Engineers will provide the interpretation of the geotechnical conditions and properties of the future viaducts between Cornetu and Tigveni (kms 44+500 and 81+900). The assessment is based on in-situ testing,  geophysical/seismic testing and laboratory testing.

SIBIOU2.png

Siiou-Pitesti road map

Previous 

Next

bottom of page